Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 41 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
Restoration and stabilisation of approximately 220m of riverbank along the Owenmore River where erosion has occured. These works will include the placement of rock armour stone to the lower sections of riverbank, and soft engineering measures to the upper sections of riverbank. The soft engineering measures will include the installation of coir/jute matting and re-vegetation works. A NIS has been prepared in respect of this planning application.
ERECTION OF AN EXTENSION TO THE EXISTING DWELLING HOUSE AND TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS
Erection of dwelling house, installation of a wastewater treatment system and percolation area, site access onto public road, and to include all other ancillary site services and development works
The development will consist of the of the following, No 1 Renovation of existing workshop / shop, construction of extension to front and rear of existing workshop /shop. No 2 removal of existing fuel pump island, construct new fuel pump island forecourt area and filling station canopy. No 3 Installation of underground bunded fuel tanks and associated pipework etc. No 4 Installation of a totem sign to the south east corner of the site. No 5 Construction of carwash area, car parking area to rear of side of site, EV charging points and associated car parking space, HGV fuel pump area to the east side of the site along with any other ancillary site works required.
CONSTRUCT A DETACHED DWELLING HOUSE, DOMESTIC GARAGE, CONNECTION TO PUBLIC SEWER/MAINS AND ALL ASSOCIATED SITE WORKS
Retain dwelling house and all ancillary site works
The brief summarizes the pattern across all 41 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2330The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief