Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 444 decisions within 5 km, 2 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A change of use from retail unit to gymnasium, office, W.C.
Change of use of an existing ground floor unit from use as a kitchen showroom to use as a day centre for people with disabilities
(A) construction of portal frame type building to contain a truck maintenance area and commercial vehicle testing area with associated offices and ancillary areas. (B) Installation of a truck wash. (C) Connection of existing foul and storm sewer network with connection to all utility services with all associated site works
(a) change of use of existing building to a commercial vehicle testing centre, (b) the construction of a rear and side extension to same, (c) existing connection to all public utility services with all associated sites works
The change of use of the larger building from factory workshop and showroom to a warehouse with trade counters (for the sale of building related products principally to trade). The separate storage shed to the north west of the main building will be retained for storage and be used separately from the main building. Proposed external works include the following amendments. Southerly elevation: replace roller doors with new entrance to new internal trade counters and existing showroom entrance door with a solid door for a "goods in", entrance and install signage, including LED downlighter on the main sign. Easterly elevation: block up existing opening. Westerly elevation: install mechanical plant. Northerly elevation: close up existing opening. Other external works including remarking parking spaces and inclusion of a mobility parking space to the front (southerly side) of the building. Internal works to create a trade counter area and removal of a first floor/mezzanine area and internal dividing wall to create clear height space for storage racks. All other works associated with the completion of the proposed development
The construction of a new industrial building; comprising of an enclosed workshop, along with open side machinery, a plant and vehicle storage area, including works to common boundary and all associated site development works at our facility
The brief summarizes the pattern across all 444 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23384The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief