Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 102 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of calf rearing shed along with ancillary site works
DEMOLISH EXISTING STORAGE BUILDING, EXTENSION OF EXISTING 3 BAY SHED, CONSTRUCTION OF A 4 BAY OPEN SLATTED SHED WITH A CREEP AREA AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS.
Works to include Retention of extension to existing dwelling house and amendments to elevations.
Permission is sought for the continued use of an existing authorised industrial facility (comprising a concrete batching plant, aggregate crushing, screening and washing facilities) on the site as currently permitted under Plan File Ref. No. 16/1001, within an application area of c.18 hectares, for a further period of 35 years. The development includes the continued use of the established site entrance with road signage, internal access road, importation of materials, processing plant, ESB substation, closed-circuit lagoon system, wheelwash, weighbridge, office, and a hardstand area with hydrocarbon interceptor. No new works are proposed as part of this application.
EXTRACTION OF UP TO 40,000 TONNES PER ANNUM OF GRAVEL DEPOSITS OVER A 4.0 HECTARE EXTRACTION AREA, WITHIN A 4.6 HECTARE DEVELOPMENT SITE, REMOVAL OF GRAVEL OFF-SITE, AND RESTORATION OF A GRAVEL PIT, OVER A 15 YEAR TERM, WITH PROVISION FOR OCCASIONAL DRY SCREENING
CHANGE OF HOUSE TYPE FROM THAT GRANTED UNDER P18/385
The brief summarizes the pattern across all 102 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23433The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief