Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 409 decisions within 5 km, 4 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for extension to the existing changing room, erection of a ball stopping net, installation of waste water treatment system and all associated site works *SFI received on 28.6.24 includes change of site boundaries from original submission.* Split Decision to: a)Granted for an extension to the existing changing room, installation of wastewater treatment system and all associated site works subject to the conditions outlined in Schedule 1. b) Refused for the erection of a ball stopping net for the reason outlined in Schedule 2.
Permission for proposed floodlighting to existing GAA pitch consisting of 6 no. 18 metre high poles (3 to each side of pitch) with associated light fittings, 2 no. ball stop nets behind goals at end of pitch and all associated works **Significant further information received 1.6.23 in relation to rentention of works undertaken along the eastern site boundary-installation of fencing, retaining structures, dugouts, pedastrian gate/steps, vehicle entrance gate and pillars (replacing previous vehicle entrance along this boundary) all as constructed.**
Retention of existing tiered spectator seating as constructed together with permission for proposed mono-pitch roof over and all associated works
Permission for development will consist of provision of a detached garage and minor alterations to approved house and all associated site development works.
Permission for proposed dormer extension to existing single storey dwelling house incorporating single storey extension to rear of same and installation of new proprietary waste water treatment system/percolation area together with associated site works *Significant Further Information Received on 07/02/2022 which includes a revised design*
Permission for the provision of a detached garage with pitched roof and all associated site development works
The brief summarizes the pattern across all 409 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23463The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief