Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 204 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) a truck wash and ancillary water recycling system, (b) increase in the size of a concrete external apron as permitted under planning ref. 20/219, (c) all associated drainage infrastructure and (d) associated site works
The construction of an extension to an existing cold storage facility to include (a) additional cold storage and marshalling floor area, (b) dock levellers, and (c) all associated site works
(a) construction of a cold storage distribution warehouse with associated offices and ancillary areas, (b) construction of new entrance walls, access and internal roads with car/truck parking facilities, external lighting, boundary fencing, installation of effluent holding tanks and storm water attenuation tanks with all associated services and site works and (c) erection of signage
Existing buildings to be used for Biomass heating solutions energy recovery operation
The construction of a slatted shed, rainwater harvesting tank, meal bin, holding pen and concrete aprons
The following: (1) As-constructed agricultural building comprising a hay store, loose house & machinery store. (2) Existing vehicular entrance and all associated ancillary site works. Planning permission is also sought for the construction of a new agricultural building comprising a machinery store and slatted unit with underground effluent storage tanks and carry out all associated ancillary site works
The brief summarizes the pattern across all 204 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23491The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief