Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 88 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling house with new treatment system and percolation area including all associated site works
RENOVATE AND EXTEND THE EXISTING DWELLING HOUSE INCLUDING UPGRADE TO SEPTIC TANK TOGETHER WITH ALL ANCILLARY SITE WORKS
Extensions to existing Dwelling House along with alterations and modification's to elevations including new pitched roof to front and associated internal alterations
CONSTRUCTION OF NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH WASTEWATER TREATMENT SYSTEM ALONG WITH ALL NECESSARY SITE WORKS AND ANCILLARIES
CONSTRUCT A STANDALONE SPORTS HALL FACILITY TO INCLUDE, A NEW PURPOSE BUILT INDOOR 668 SQM SPORTS HALL WITH RECREATIONAL AND PLAY AREA, PURPOSE BUILT SPORTS GYMNASIUM, CHANGING ROOMS WITH TOILET AND SHOWER FACILITIES, STORE ROOMS, ANCILLARY ACCOMMODATION AND OFFICE ACCOMMODATION. THE DEVELOPMENT WILL BE INCLUSIVE OF SITE DEVELOPMENT WORKS WITH CAR PARKING AND DRAINAGE CONNECTIONS TO EXISTING SERVICES ALONG WITH ALL NECESSARY SITE WORKS AND ANCILLARIES
The development will consist of the construction of 2 no. of staff accommodation units with connection to public services together with all ancillary site works.
The brief summarizes the pattern across all 88 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23599The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief