Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 206 decisions within 5 km, 4 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For construction of a new two storey extension to the rear of my existing single storey dwelling, demolition of two previous extensions and associated making good of the existing building following demolitions, design changes to the existing building facades + retention of existing domestic garage and all associated works
For (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and electrical service connections; (d) Modifications to the existing electrical control system to support new works; (e) Extension to the existing high fence around the existing storage site, to incorporate the expanded site; (iii) Solar PV panels to area; to be mounted on the new service reservoir roof slab (static and south-west facing); (iv) Associated temporary works including temporary compound area for the construction period; (v) Associated works including landscaping and biodiversity net gain. There are no demolition works proposed as part of this Project. In addition, a Landscaping and Biodiversity Net Gain (BNG) Plan has been prepared as part of the proposed development. Refer to Volume 2, Drawing No. 20788-NOD-04-XX-DR-C08015 for a copy of the Landscape Plan. Planting shall commence in the first planting season following commencement of development on the site
For development. The development will consist of (i) a new treated water storage tank, (ii) extension of the existing vehicle access track, (iii) ancillary development works and (iv) associated temporary development works, including a temporary compound area for the construction period
For extension to existing dwelling house, to include kitchen/ dining/ living area, bathroom, 3 no. bedrooms, ensuite and entrance porch, and all associated site works
For the erection of a dwelling house and domestic garage/store with treatment system and percolation area and all associated site works
To upgrade existing septic tank and percolation area to new treatment plant and soil polishing filter and all associated site works
The brief summarizes the pattern across all 206 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360013The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief