Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 940 decisions within 5 km, 5 exact-site or onsite candidate records, and 90 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
90 structured nearby appeal records.
90 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the proposed erection of a Security Cabin on site comprised of Security Office, Canteen and WC together with Treatment Plant and associated Polishing Filter and all associated site works and ancillary services on site
For (1) Permission for Retention of the following, (a) the erection of a concrete kerbing on site, (b) the revision of fencing layout from that previous granted under Planning reg No's P15/251 and P17/79 consisting of the removal of the palisade Fencing from the kerbing on top of the sloped sections of ground and the replacing of the Stout Timber fencing with a Palisade Security fence to provide the necessary Security on site and (c) Retention and Completion of the creation of a concrete covered compound (a part of the site which was granted Permission under Planning Reg No. 17/79) for the storage of palletised bagged fertiliser on site, and also for (2) Permission for the proposed installation of Surface Water drainage and Attenuation to cater for the new compound area on site
For a development at this site. The development will consist of alterations to a previously permitted development (Planning Ref. 2560233) and will include the following: • Construction of additional 428m2 of single storey bulk storage to Block B. • Relocation of some door openings and inclusion of additional doors to the rear in Block B, • Construction of a new single-storey staff canteen/office building (floor area 34.8m²), • Construction of a new single-storey ESB substation (floor area 18.5m²), and • All associated and ancillary site works
Constructing 2 no. industrial warehouse blocks for bulk storage, with Block A housing 4 no. single storey storage units (floor area - 3,488.4m2) and Block B housing 4 no. single storey units (floor area - 8446.2m2), new weighbridge and cabin, new internal access roads, retaining walls and boundary fencing and all ancillary works
For the indefinite retention of existing single storey garage/store to side/front and conservatory to rear of existing bungalow, together with permission for indefinite retention of assorted single storey outbuildings/'non-commercial' storage shed to rear of house (solely for the personal/incidental use of the dwelling)
To refurbish and extend our dwelling. Works will include to construct a single storey extension to the front, a single storey extension to the rear, Elevation changes and to connect the dwelling to the public sewer, along with all associated site development works
The brief summarizes the pattern across all 940 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360046The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief