Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The decommissioning of the two existing septic tanks and the construction of a new wastewater treatment system consisting of a tricel novo p6 unit followed by a sand cell 900 sand filter and a soil polishing filter
(A) construct a new dwelling (B) install a mechanical treatment system and raised sand polishing filter (C) construct a vehicular site entrance and (D) construct all associated site works at Carrahane Lower, Ardfert, Co. Kerry
(A) CONSTRUCTION OF A NEW DWELLING, (B) INSTALL A MECHANICAL TREATMENT SYSTEM AND RAISED SAND POLISHING FILTER, (C) CONSTRUCT A VEHICULAR SITE ENTRANCE, AND (D) CONSTRUCT ALL ASSOCIATED SITE WORKS
(A) CONSTRUCT A DOMESTIC SHED WITH ALL ASSOCIATED SITE WORKS
RETAIN A DOMESTIC GARAGE WITH LOFT STORAGE AS CONSTRUCTED AND ALL ASSOCIATED SITE WORKS
Retain domestic shed with a reduced roof height of 5.63m with associated elevational changes
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360377The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief