Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 755 decisions within 5 km, 1 exact-site or onsite candidate record, and 52 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
52 structured nearby appeal records.
52 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For development which consists of a new water treatment plant (WTP) located in the townland of Ballynamuck West, Dungarvan, Co. Waterford. The development will consist of the following: (1) a new raw water tank (above ground structure). (2) a new used washwater equalisation storage tanks (UWWEST) (below ground structure). (3) a new contact tank and storage reservoir (below ground structure). (4) a new process building with solar panels on the roof. (5) a new administration building. (6) a new pumphouse building. (7) a bunded external area for chemical storage tanks, kiosk and emergency shower. (8) a new ESB substation building and a new generator and fuel storage tank. (9) new boundary fence to include 2.4m high palisade fence with security gate. (10) new drainage network and retention pond. (11) new entrance onto the R672 and new access road as well as (12) all associated site works The proposed development will include a pedestrian link with the existing water tower site and modifications to the existing fence to close the existing vehicle access to the water tower.
Renovation and extension of existing single-storey dwelling house, replace existing garage and provide storage shed, provide upgraded entrance and replace existing septic tank with waste water treatment system and percolation system and all necessary ancillary works.
Of the as built dwellinghouse and garage
The conversion of the existing attic to habitable space, the construction of 3 no. dormer windows each to the front and rear, and the remodelling and refurb of the existing house, including all associated elevational changes and site works
Construction of a new single storey dwelling, garage, new entrance, wastewater treatment system and all ancillary works
Construction of a new dwelling, garage, new entrance, wastewater treatment system and all ancillary works
The brief summarizes the pattern across all 755 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360631The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief