Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,239 decisions within 5 km, 11 exact-site or onsite candidate records, and 207 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
207 structured nearby appeal records.
207 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Minor alterations to layout of existing premises which includes installation of kitchen equipment for the preparation and sale of hot food ancillary to FunWorld (Ireland) Limited. To include all ancillary associated services and related works
Existing 3D illuminated signage over existing front entrance which is a replacement previous display signage at same location over front entrance, to include all ancillary associated services and related works
(a) carwash/valet canopy structure incorporating signage (43 sq.m) and (b) ancillary reception/office unit (9 sq.m) with overhead water storage container
Extension/renewal of the period of use of existing Modular Classroom unit granted permission under Planning Permission Ref No 17/335 for a further 3 year period
The installation of a compact modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area
The development that will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area
The brief summarizes the pattern across all 2,239 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360665The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief