Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 481 decisions within 5 km, 3 exact-site or onsite candidate records, and 31 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
31 structured nearby appeal records.
31 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The repurposing of the existing stables and outbuilding to new use as office/canteen/staff welfare facilities inclusive of alterations to the existing building façade, an extension of 29.4 sq m and new roof to the existing building, connection to necessary services together with all associated incidental and ancillary works
The construction of a detached dormer dwelling, utilisation of existing entrance, connection to necessary services together with all associated incidental and ancillary works
(i) the provision of a new single storey office building of 242m²; (ii) a fabrication workshop of 1943m² with adjoining two storey mezzanine of 311.4m², with staff facilities at the ground floor & offices at the first floor; (iii) a paint shed of 200m²; (iv) a gas bottle storage cage of 12m²; (v) Signage Pylon to the entrance (vi) ESB sub-station and switch room of 24m² &; (vii) 30No. surface parking bay including 3No. EV charging bays, secure bicycle shelter, hard standing, hard & soft landscaping, boundary treatment to the perimeter of the site, entrance gates, site lighting & all associated site works; this application is accompanied by an EIA screening report, a Natura Impact Statement (NIS) & a screening statement for Appropriate Assessment
A new entrance and driveway to our residence, closing the existing entrance and associated site works
The construction of a dwelling house with garage, to form recess to existing site entrance, connection to existing public sewer and all associated site works
Extension of Duration for Planning Ref. 21/996: the construction of a dwelling house with garage, to form recess to existing site entrance, connection to existing public sewer and all associated site works
The brief summarizes the pattern across all 481 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360767The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief