Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 60 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
Construction of a new dwelling house, domestic garage, septic tank effluent treatment system and percolation area along with ancillary site works
CONSTRUCT A GENERAL PURPOSE SHED WHICH WILL BE ASSOCIATED WITH AND ANCILLARY TO THE EXISTING DWELLING HOUSE ON THE SITE TOGETHER WITH ALL ANCILLARY SITE WORKS
RETAIN THE DEVELOPMENT AS CONSTRUCTED TO DATE, INCLUDING ALL SITE BOUNDARIES AS CONSTRUCTED AND ALL SITE WORKS ASSOCIATED WITH THE PREVIOUS GRANT OF PLANNING PERMISSION FOR THE CONSTRUCTION OF A DWELLING HOUSE, GARAGE AND FOUL EFFLUENT TREATMENT SYSTEM UNDER P06/2037. COMPLETE THE DEVELOPMENT NAMELY THE COMPLETION OF DWELLING HOUSE, GARAGE AND FOUL EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES.
CONSTRUCT A PROPOSED NEW DWELLING HOUSE, GARAGE, SEPTIC TANK SYSTEM AND PERCOLATION AREA COMPLETE WITH ALL ASSOCIATED WORKS
Permission to construct 1. A new extension to the rear of an existing dwelling 2. Construct a new brick gazebo. 3. To upgrade the existing on-site septic tank system with a proposed new wastewater treatment system with infiltration/treatment area and 4. Retention planning permission for a garden shed and roofed concrete areas and all associated site development works at
Permission to Retain dwelling house, domestic garage and fuel store and associated services on revised site boundaries at
The brief summarizes the pattern across all 60 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23611The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief