Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 60 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new dwelling house, domestic garage, septic tank effluent treatment system and percolation area along with ancillary site works
CONSTRUCT A GENERAL PURPOSE SHED WHICH WILL BE ASSOCIATED WITH AND ANCILLARY TO THE EXISTING DWELLING HOUSE ON THE SITE TOGETHER WITH ALL ANCILLARY SITE WORKS
RETAIN THE DEVELOPMENT AS CONSTRUCTED TO DATE, INCLUDING ALL SITE BOUNDARIES AS CONSTRUCTED AND ALL SITE WORKS ASSOCIATED WITH THE PREVIOUS GRANT OF PLANNING PERMISSION FOR THE CONSTRUCTION OF A DWELLING HOUSE, GARAGE AND FOUL EFFLUENT TREATMENT SYSTEM UNDER P06/2037. COMPLETE THE DEVELOPMENT NAMELY THE COMPLETION OF DWELLING HOUSE, GARAGE AND FOUL EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES.
CONSTRUCT A PROPOSED NEW DWELLING HOUSE, GARAGE, SEPTIC TANK SYSTEM AND PERCOLATION AREA COMPLETE WITH ALL ASSOCIATED WORKS
Permission to construct 1. A new extension to the rear of an existing dwelling 2. Construct a new brick gazebo. 3. To upgrade the existing on-site septic tank system with a proposed new wastewater treatment system with infiltration/treatment area and 4. Retention planning permission for a garden shed and roofed concrete areas and all associated site development works at
Permission to Retain dwelling house, domestic garage and fuel store and associated services on revised site boundaries at
The brief summarizes the pattern across all 60 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23611The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief