Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 666 decisions within 5 km, 2 exact-site or onsite candidate records, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A SINGLE STOREY EXTENSION TO THE SIDE OF EXISTING DWELLING INCLUDING INTERNAL ALTERATIONS. TO CLOSE AND RELOCATE EXISTING ENTRANCE AND A NEW DOUBLE GARAGE FUEL/UTILITY STORE INCLUDING ALL ASSOCIATED SITE WORKS AND ANCILLARY SERVICES
CONSTRUCTION OF AN EXTENSION. THE PROPOSED GROUND FLOOR EXTENSION IS TO THE REAR OF EXISTING DWELLING. THE APPLICATION WILL ALSO INCLUDE ALL ASSOCIATED SITE-WORKS
A 10 year planning permission. The development will consist of a grid system services facility within a total site area of 3.5 hectares. The proposed development will have a projected life span of 30 years. The development will include 1 no. single storey electrical substation building, 1 no. customer substation control and switch rooms, up to 20 no. electrical inverter/transformer station modules mounted on concrete plinths, up to 80 no. containerised battery blocks on concrete support structures and associated heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates and perimeter security fencing up to 2.6m palisade fencing, CCTV security monitoring system, landscaping works and all associated ancillary infrastructure.
A GRID SYSTEM SERVICES FACILITY WITHIN A TOTAL SITE AREA OF 0.84 HECTARES, TO INCLUDE 1 NO. SINGLE STOREY ELECTRICAL SUBSTATION BUILDING, 1 NO. CUSTOMER SWITCHGEAR CONTAINER, 17 NO. 2MW ELECTRICAL INVERTER/TRANSFORMER STATION MODULES (SKIDS), 10 NO. CONTAINERISED BATTERY STORAGE MODULES ON CONCRETE SUPPORT STRUCTURES, 40 NO. HEATING, VENTILATION AND AIR CONDITIONING UNITS (HVAC UNITS), ACCESS TRACKS AND UPGRADED SITE ENTRANCE, ASSOCIATED ELECTRICAL CABLING AND DUCTING, SECURITY GATES AND PERIMETER SECURITY FENCING, CCTV SECURITY MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE
An existing single storey extension to the rear & side of an existing dwelling house & associated site works
DORMER STYLE DWELLING, GARAGE, TREATMENT SYSTEM, PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 666 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24156The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief