Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 767 decisions within 5 km, 5 exact-site or onsite candidate records, and 71 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
71 structured nearby appeal records.
71 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(A) PLANNING PERMISSION TO REMOVE 3 NUMBER STEEL CONTAINERS AND A CONCRETE BASE FROM THE SITE (B) PLANNING PERMISSION TO CONSTRUCT 2 NUMBER 2 STOREY DWELLING HOUSES AND ALL ASSOCIATED SITE WORKS, BOUNDARIES, FOOTPATHS, OPEN SPACES. (C) PLANNING PERMISSION TO REMOVE PART OF EXISTING STONE ENTRANCE AND PLANNING PERMISSION TO ALLOW FOR A 5.5 METRE WIDE ACCESS ROAD TO THE DEVELOPMENT (D) PLANNING PERMISSION TO CONSTRUCT A NEW SERVICE ROAD (E) PLANNING PERMISSION TO DIVERT EXISTING STREAM TO THE REAR OF THE SITES
(A) RETAIN EXISTING PREMISES PART OF WHICH WILL BE FOR GUEST ACCOMMODATION USE AND PART FOR PRIVATE USE AS CONSTRUCTED WITHIN REVISED SITE BOUNDARIES (B) PLANNING PERMISSIION TO ALTER LOCATION OF EXISTING DRIVEWAY SERVING THE PREMISES AND ALL SITE DEVELOPMENT WORKS
Full Planning Permission for change of use from office use to use as a doctor’s surgery
Planning Permission to construct a new dwelling house with garage with all associated site works
(A) RETENTION OF ALTERATIONS TO LADIES AND GENT'S TOILET BLOCK AND ASSOCIATED WORKS. (B) PERMISSION TO CHANGE OF USE OF EXISTING BEER GARDEN AND TOILET BLOCK FROM TEMPORARY FACILITIES GRANTED UNDER PLANNING PERMISSION REG 20/1271 TO A PERMANENT EXTENSION OF EXISTING BAR AND RESTAURANT. (C) PERMISSION TO CARRY OUT ALTERATIONS TO ELEVATIONS INCLUDING BLOCK WALL STRUCTURE TO NORTHERN ELEVATION, CLADDING AND GLAZING TO EASTERN ELEVATION, BLOCK OUT OPEN GAP BETWEEN EXISTING WALL AND ROOF STRUCTURE ON SOUTHERN ELEVATION. (D) PERMISSION TO CARRY OUT SOUND PROOFING TO EXISTING ROOF AND EXISTING BAR AREA AND CONSTRUCT NEW FLAT ROOF OVER LADIES AND GENT'S TOILET BLOCK
(1) CONSTRUCT A ROOF CANOPY ON THE SOUTH & EAST FACADE OF EXISTING BUILDING AND CONSTRUCT EXTENSION TO BAR AREA (2) RETENTION PERMISSION TO RETAIN THE CAR PARK AND ENTRANCE/EXIT (3) RETENTION PERMISSION TO RETAIN THE COVERED SMOKING AREA STRUCTURE THAT HAS BEEN CONSTRUCTED TO THE REAR OF THE BUILDING
The brief summarizes the pattern across all 767 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24237The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief