Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 269 decisions within 5 km, 1 exact-site or onsite candidate record, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a five bay linear roof shed, seepage tank and associated ancillary works
To construct a 3 column round roof shed and associated ancillary works
For the following works: 1) construct a new dwelling house which will replace the existing cottage on the site 2) To change the use of the existing cottage from use of a cottage to a shed/store 3) install proprietary wastewater treatment system, percolation area and associated ancillary works
For development which will consist of: conversion of the existing garage into a double-occupancy communal dwelling unit. Works include internal alterations to provide living, dining, and bathroom facilities for persons with intellectual or physical disabilities, along with modifications to external elevations and all associated site works. The proposed unit will have a gross floor area of 101 sqm and will be located on the north-east side of the existing main residential care unit
Of existing attic development not approved under planning reference number 07/3011 and planning PERMISSION is sought to carry out modifications to include dormer windows to the front and side and replace existing ground floor windows
To construct an entrance, dwelling house, detached garage, advanced wastewater treatment system and soil polishing filter together with all ancillary site development works
The brief summarizes the pattern across all 269 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24247The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief