Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 270 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of an extension to the existing school consisting of: 1. an additional mainstream classroom, 2. a two-classroom special education needs unit with central activity space and associated rooms and circulation spaces, 3. alterations to the existing school building including the demolition of two toilets 4. new site entrance and boundary treatments, 5. new car park and set down area, 6. proprietary wastewater treatment system polishing filter, and all ancillary site works
The replacement of existing grass playing pitch with an all-weather playing pitch, erection of perimeter fencing, goal posts and ball stop netting including all ancillary site works
Temporary living accommodation unit and screen wall together with associated site works
(1) Permission for (a) renovate existing dwelling, including elevational changes (b) decommission existing foul treatment system and install a new tertiary treatment system and infiltration/ treatment area c construct a new vehicular site entrance (d) all ancillary site works. (2) Retention Permission to retain existing sheds to rear of dwelling
The construction of a dwelling house, waste water treatment system and percolation area, entrance and all ancillary site works
A new single storey dwelling, single car garage and associated car port, opening of a new vehicular entrance to site and wastewater treatment system and polishing filter together with all associated site development works
The brief summarizes the pattern across all 270 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24414The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief