Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Deerpark Upper , Belcarra , CastlebarOpens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Deerpark Upper , Belcarra , Castlebar

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 1 exact-site or onsite candidate record, and 8 structured appeals.

Matched source
24479
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Confirmed coverage

One current citation from the Mayo County Council development plan, with section, page and source URL.

1 matched

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

8 structured nearby appeal records.

8 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.

1 matched
197Nearby applications
1Site-linked candidates
8%Nearby refused
8Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

24479

Construction of a dwelling house with effluent treatment system and a domestic garage together with associated site works

Granted0.0 km03 March 2025
19526

CONSTRUCT DWELLING HOUSE AND GARAGE TOGETHER WITH ALL ANCILLARY SITE WORKS

Granted0.4 km23 January 2020
2560843

Application is being made to Mayo County Council on behalf of Achill Formwork & Construction Ltd. For planning permission to revise the housing development previously granted planning permission, Ref. No. P19540 (Permission for 17 No. Houses) The revised development will consist of changes to Phase 3 of this housing development, under construction, now known as The Waterways: To replace 6 No. 3 Bedroom terraced houses (2 blocks of 3 houses) with 8 No. Semi-Detached houses. This will provide a total No. of 19 No. houses including minor revisions to the access road and turning bay layout along with all associated site works and services

Granted0.9 km21 January 2026
19540

CONSTRUCT 22 HOUSING UNITS, CONSISTING OF 9 NO. DETACHED UNITS, 4 NO. SEMI-DETACHED UNITS AND 9 NO. TERRACED HOUSING UNITS, CONSTRUCTION OF A NEW SITE ENTRANCE, CONNECTION TO EXISTING SERVICES, NEW BOUNDARY TREATMENTS, SITE LANDSCAPING AND ALL ASSOCIATED SITE WORKS

Granted1.0 km17 September 2020
22478

Retain existing dwelling house incorporating domestic garage on revised site boundaries to that previously granted planning permission under reference no. P81/1480.

Granted1.0 km09 August 2022
19378

SINGLE STOREY EXTENSION OT THE NORTH WEST SIDE OF THE EXISTING DWELLINGHOUSE AND CONSTRUCTION OF A THREE-BAY DOMESTIC GARAGE

Granted1.0 km15 July 2019

The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required