Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 852 decisions within 5 km, 2 exact-site or onsite candidate records, and 46 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
46 structured nearby appeal records.
46 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Carry out essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Maintenance and repair works to the Barrow Navigation comprising post-flood spot dredging and maintenance dredging, (ii) A new temporary access road providing access to the Barrow trackway from Leighlin Road to facilitate the proposed works, (iii) Temporary mobile welfare units and, (iv) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application.
The closing up of an existing vehicular entrance, raising the height of an existing wall to 2 metres, the construction of a new vehicular entrance and 2 metre high walls, the replacement of an existing boundary fence with a 2 metre high timber panel fence and the construction of a new driveway at the proposed entrance
The development at this site: Erindale, Mortarstown Upper, Carlow, Co. Carlow R93 E5Y0. A protected structure (RPS Ref. No. CW66) The development will consist/consists of: Demolition of a two-storey extension to the rear of the house and a single-story extension to the side of the original house. The construction of a new two-storey extension to the rear and two-storey (basement and ground) extension to the side. The reroofing of the house to there original detail, refurbishment of original windows and replacement of some non-original windows. Reinstatement of two blocked up windows to the rear. Alterations to the internal layout. New mechanical and electrical services. Removal of septic tank and connections to mains. No parking or significant trees will be affected
Modifications to development previously permitted under PL Ref: 15/324 & PL Ref: 18/178 comprising of (i) alterations to Pavilion building roof structure including revisions to roof lights (ii) revisions to material finishes on the elevations of the pavilion building. (iii) Revisions to the elevations and internal layout of the maintenance building. (iv) Revisions to Signage at main site entrance. (v) and all associated works.
Two number signs at the entrance to the new sports campus previously permitted under PL Ref. 15/324 and all associated works
Phase 2 of the New Sports Campus. The planning application relates to the a second phase of a previously permitted sports pitches development (permitted under PL. Ref 15/324):- This planning application therefore relates to 1) new pavilion building (1,241 sq.m), maintenance building (300 sq.m) with yard enclosure, ESB substation/switch room (28 sq.m), 2) 400 m 8 lane synthetic running track, long jump and track enclosure, 30m long synthetic cricket area, 3) new boundary wall along the western boundary where the site fronts the public road, 4) The drilling of well(s) on site with ancillary irrigation tank for irrigation of the pitches, 5) lighting to walking track permitted under PL Ref. 15/324, 6) minor revisions and adjustments to site layout and parking layout to include 6 no. additional car parking spaces to permitted car park permitted under PL. Ref. 15/324 and the addition of 104 no. carpark spaces to service the now proposed pavilion building and all ancillary services/associated landscaping works
The brief summarizes the pattern across all 852 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460049The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief