Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 332 decisions within 5 km, 3 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Application for extension of duration of planning permission for the refurbishment and re-use of part of Dunleckney Maltings, Bagenalstown, a protected structure. It is proposed to refurbish building 4 (323 sq m) for re-use as an enterprise centre, ancillary to the existing primary industrial use, to include visitor reception, visitor facilities, promotion of industrial building including maltings and brewing. The proposed works will include the removal of the following: modern rainwater goods; upper floor of timber and concrete; timber and metal shutters; blockwork infill to openings, together with all existing building services to Building 4, and modern kiosk and weighbridge. It is proposed to refurbish Building 4 with the installation of insulated composite panel corrugated metal roofing, timber windows to the existing openings and unblocked openings, install a new raised insulated timber floor to the ground level using salvaged boards, form six new openings fitted with glazed doors, install two external ramps and internal ramp and timber decks to the south and west sides, install a mezzanine level, sanitary facilities, kitchen and reception / servery, clad out the existing mass concrete buttresses in brick to match with signage to form main entrance, new paving to the courtyard, installation of new parking facilities for sixteen cars including two accessible spaces, parking for a coach, bicycles, external lighting, bunded oil storage tank behind fencing, new foul drainage underground pump unit and connection into main drainage.
To construct a dormer style dwelling house, new site entrance, connect to public sewer and water mains, all ancillary site works and services
To construct a 1543sqm training all weather artificial turf pitch with surrounding 6.0m fencing and access gates and 4no. 10.0m flood light poles and all associated site works on existing tennis courts
To construct bicycle shelter and associated site works
1. erect two of 8.0M height flood light poles to the existing training area and associated works. 2 Erect PV Solar Panels on the roof of existing club house and associated works
The brief summarizes the pattern across all 332 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460091The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief