Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 248 decisions within 5 km, 3 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Of alterations to previously approved under planning Ref:20/332. Alterations include amendments to site layout and floor plans, elevations, and all ancillary site works
Erect fully serviced industrial unit incorporating 2 storey administration & staff facility areas, single storey storage, pick & pack areas, access off existing service road, parking, signage, landscaping, boundary treatments, connection to public sewer, surface water, watermain and utility services and all ancillary and associated works
For development of: (a) erect single storey industrial unit for storage (b) alterations to site layout and site boundaries under previously approved (planning Ref:20/332) and all ancillary and associated site works
To construct a fully serviced factory premises, comprising a single storey production area, engineering works/fabrication/painting/finishing area; delivery and dispatch areas along with internal and external storage. Also two storey administration block containing offices and ancillary accommodation. External works to include car parking, access road, perimeter fencing, wash bay with interceptor, signage, flagpoles, lighting and storage racks. All Connected to existing (and proposed) access road and public services. Significant further information and revised plans have been submitted
Will consist of the construction of an extension to the rear of the existing engineering workshop building and all ancillary site development works
Construct extension to the side of existing engineering workshop building and all ancillary site development works
The brief summarizes the pattern across all 248 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460136The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief