Applications tied to the site
Partial coverage14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 403 decisions within 5 km, 14 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a three storey extension to rear and renovation of existing building to provide additional retail floor area on the ground floor, and 8No. apartments at 1st and 2nd floor level and all associated site works
Permission for retention of a change of use of an existing retail outlet to amusement arcade, amalgamation of the new amusement arcade area with an existing adjoining amusement arcade (Digbys) and all associated site development works.
Permission for a change of use of the existing vacant first and second floor restaurant / office use to bed and breakfast / hostel accommodation, alterations to the elevations, new access / escape stairs to the rear and renovations including the inclusion of a lightwell / courtyard on the first floor and all associated site development works
Permission for change of use of the existing vacant first and second floor restaurant / office use to bed and breakfast / hostel accommodation, alterations to the elevations, new access / escape stairs to the rear and renovations including the inclusion of a lightwell / courtyard on the first floor and all associated site development works. Significant Further information submitted relates to, Site specific justification report, Site Plan & Proposed drawings
Permission to change use of vacant take-away, restaurant & Living accommodation to hostel accommodation at first & Second floor level of existing three storey mixed use commercial building and all associated site development works.
1. Retention of elevational changes to Glencarn Shopping Centre, retention of external steel gantry servicing existing plant room, retention of air conditioning units and retention of existing external signage and ancillary site development works (2) Permission for the removal of condition No. 8 of planning permission Ref.04/40009 which states: Before the development is commenced the developer shall pay to Castleblayney Town Council a contribution of €500,752 towards the expenditure incurred or proposed to be incurred by he Council in the provision of car parking which will facilitate the proposed development. The method of payment of this contribution shall be agreed with the Planning Authority prior to the commencement of any work on this development.The payment of the said contribution shall be subject to the followingl(a) Where the proposed works are, within a period of 7 years from the date of payment of the full contribution or final installment payment thereof, not commenced the return of te contribution or the installments therof, paid during that period. (b) Where the proposed works are, within a period of 7 years from the date of payment of the full contribution or final instllment payment thereof, carried out in part only, or in such a manner as to facilitate the proposed development to a lesser extent, the return of a proportionate part of the contribution or the installments thereof during that period (c) Payment of interest at the prevailing interest rate payable by the Council on the contribution or any installments therof that have been paid so long as and in so far as it is or they are retained unexpended by the Council.
The brief summarizes the pattern across all 403 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460157The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief