Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 156 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development which will consist of the construction of: 1. A match pitch, training pitch and astro-turf pitch with Hurling wall. 8no. 18m flood lights to main pitch, 6no. 18m flood lights to the training pitch and 6no. 8m light posts to astro-turf pitch and hurling wall. 2. A part two-storey, part single storey sports hall, with ground floor consisting of a basketball and badminton court. W.c., meeting room, kitchen and team changing rooms and shower facilities and first floor consisting of a gym and viewing gallery. 3. Public walking track, including low level lighting. 4. A maintenance depot for storage of equipment and machinery. 5. Proposed entrance off the public road and 115 no. car parking spaces, including 4no disabled spaces and bus drop off zones and bus parking including low level lighting. 6. The installation of a proprietary PE80 wastewater treatment system and 7no. TER 3 Packaged Tertiary Units and attenuation layer and ancillary site works. 7. Spectators Stand
Construction of one number detached dwelling, to upgrade existing entrance to public road, to connect to public watermain, to install a mini-treatment system and polishing filter and all associated site works
To construct a new dwelling, garage, wastewater treatment system and percolation area and all associated site works.
A detached garage and all associated site works located at the rear of existing dwelling house
To construct a new dwelling, garage, wastewater treatment system and percolation area and all associated site works
To construct a two storey dwelling, detached domestic garage and store, install a proprietary wastewater treatment system and all associated site development works
The brief summarizes the pattern across all 156 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460187The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief