Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,365 decisions within 5 km, 1 exact-site or onsite candidate record, and 111 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
111 structured nearby appeal records.
111 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For 1) Permission to construct seven serviced sites for Industrial units. 2) Connection to all existing services and all associated site works
To carry out development on a 0.912-hectare site. The development will consist of: a. The construction of a 3046 sq.m. portal frame steel clad building to be used as a Warehouse storage building with associated offices and staff facilities. b. Associated yard areas, loading bays with projecting canopy, carparking, bicycle parking, internal roads, landscaping, connection to existing foul and surface water services and site lighting. c. Ancillary storage building of 195 sq.m. steel clad building. d. Utilizing existing site entrance to existing estate road/ public road. e. Proposed new site entrance to existing estate road/ public road. f. All site levelling, boundary fences, retaining structures and treatments. g. and all associated sites work
(1) Retention permission for a metal clad garage/storage shed. (2) Permission for the construction of a storey and a half style dwelling served by the public sewer and all associated site works
(1) Retention permission for a metal clad storage shed (2) Permission for the construction of a story and a half style dwelling served by the public sewer, and all associated site works (3) Permission for a separate single-story modular dwelling to be used as temporary accommodation during the construction of the main dwelling
Permission for a metal clad storage shed. Permission for the construction of a storey and a half style dwelling served by the public sewer and all associated works. Permission for a separate single story modular dwelling to be used as temporary accommodation during the construction of the main dwelling
To construct a storage container depot, comprising 338 no. containers on a permeable hardstanding surface, and 8 no. EV parking spaces, together with associated site works
The brief summarizes the pattern across all 1,365 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460242The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.