Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 159 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(A) Retention Permission for extension and alterations to existing derelict dwelling, including; (i) increase in roof pitch to create dormer, including, at first floor, 3 no. bedrooms, with 1 no. ensuite, 1 no. bathroom, and landing (ii) removal of chimneys, (iii) gabled roof over front porch, (iv) changes to windows and doors. (B) With permission sought for; (i) completion of construction, (ii) addition of rooflights to front and rear, (iii) upgrade existing sewerage system to new treatment system and percolation area, (iv) entrance, boundary walls, and piers, (iv) with connection to existing services and all associated site works.
Development consisting of (1) to demolish the existing cottage along with the hay barn, outhouse, water pump house and the stone ruin with the concrete water trough. (2) to construct single storey dwelling house and the installation of waste water treatment plant and percolation areas. (3) re-position the existing site access and construct a wider vehicular and pedestrian access, extend the road side boundary wall to the extend of the site road frontage (west & east) (4) carrying out all other associated site and grounds works. The above said works will be carried out within the confines of the site
Development consisting of proposed construction of a new dwelling house, garage, proprietary effluent treatment unit and soil polishing filter, together with all associated landscaping and site works.
Development consisting of an existing 24 metre high telecommunications support structure with antennas, equipment container and associated equipment within a fenced compound and access track.
For development consisting of the erection of a new dormer dwelling; attendant outbuildings; entrance gates and associated landscaping including new septi tank and percolation area at the site Newpark House, a Protected Structure
Development consisting of the construction of a dwelling house, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services
The brief summarizes the pattern across all 159 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460267The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief