Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 48 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Two organic growing polytunnel units, rainwater harvesting, new entrance and all ancillary works.
A 66M2 GRANNY FLAT SIDE EXTENSION CONSISTING OF AN ADDITIONAL KITCHEN, SITTING ROOM AND BEDROOM WITH ALTERATIONS TO THE LAYOUT OF THE EXISTING DWELLING
Construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.
(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKS
A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKS
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS
The brief summarizes the pattern across all 48 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460279The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief