Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 434 decisions within 5 km, 5 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Light industrial/storage building, formation of entrance, parking, boundary wall/fence, extension of path/cycle track to frontage, connection to services and all associated ancillary site works and services
Extension to front of existing unit consisting of office and storage space 240m/sq., extension to side of existing unit consisting of loading bay/intake store 420m/sq., relevant changes to elevations and include all associated ancillary site works and services
New canopy over existing intake storage/delivery door, extension of existing access link corridor and retention of single storey washroom/store to side, relevant changes to elevations and include all associated ancillary site works and services
Changes to the previous planning (ref: 2460107), the proposed development includes changes to the car parking layout, the addition of a new truck entrance, and the installation of 16 silos (3m diameter x 11m high) with an overhead pipe bridge spanning the local access road with a clearance height of 5.03m. The proposed silos and ducting will supply raw material to the neighbouring Technimark factory, along with all related site works
The following: the construction of a 95 car-parking spaces on lands to the south of our existing manufacturing facility, the development will include the provision of a vehicular access point onto the local access road that connects to N63 Ballinalee road, together with all associated site works
The following development: Internal works: a) Conversion of part of the existing warehouse granted under PL21/29 to manufacturing area (808m²). Other works: b) The construction of an extension consisting of manufacturing areas (1060m²) and warehouse areas (1560m²). c) Construction of new two-storey quality lab (237m²) to the south east corner of the main entrance block. d) Relocation of 3 depressed loading docks positions with the provision of 1 new additional dock. e) 20 number storage silos 3m diameter x 11m high. f) Exit ramp for trucks leaving site via local road that connects to the N63 Ballinalee road. g) Demolition of an existing storage shed (79m²) h) Together with associated signage and all other ancillary and associated site works
The brief summarizes the pattern across all 434 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460317The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief