Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 684 decisions within 5 km, 6 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development which will consist of: (a) The construction of a three-storey, multiple occupant building, capable of accommodating various enterprise users. The office use will be as described under class 3 of article 10 part 4 of the 2001 planning and development regulations. (b) Connection to existing services within the estate including foul, watermain and surface water drainage services. (c) The works will also include: provision of a new site entrance to the existing estate access road, modification of the existing footpath, new footpaths, paving, parking, boundary treatments, ancillary structures including bin stores, bicycle shelter and all associated site development works to complete the development
Proposed new site entrance gates with piers, new front boundary wall with metal fencing and site boundaries together with all associated site works
Development of a truck parking area with an office building, repair shed, overground fuel storage, perimeter fence and associated site works
Development consisting of an Electrical Vehicle (EV) Charging Station, site of 0.14Ha. The development will consist of 5 no. EV charging stations, 3 no. canopies incorporating approx. 17 sqm in area of solar panels per canopy, 1 no. disabled access public convenience (WC), 1 no. ESB substation, 1 no. SSE substation with new access to and egress form the site and all associated landscaping and above and below ground ancillary works
Change of use of the existing warehouse section of Unit 40 into office and the construction of a first-floor office area within the structure of the existing warehouse. Permission is also sought for all the associated elevation changes in terms of new windows and doors and removal of some existing windows and roller shutter door. Permission is also required for revised car park/ yard layout, ancillary structures including bin stores, bicycle shelter and all associated site development works to complete the development.
Fix (2 no. total) wall mounted brand identification signage (9.75 x 2.3m approx. each) and associated external lighting to the north-east & south-east elevations.
The brief summarizes the pattern across all 684 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460370The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief