Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 89 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1)Continued use and extension to existing permitted sand and gravel pit registered under Section 261 of the Planning & Development Act 2000, as amended (site ref. QY05/10) within an overall application area of c. 12.2 hectares; 2)Extraction of sand and gravel (dry working) over an area of c. 8 hectares with processing and washing of material on site (closed loop water recycling system with associated silt storage lagoons 1,952.25m2), and all ancillary works and structures; 3)site facilities consisting of mobile processing plant, portacabin site office (6.25m²), portacabin welfare facility (18.9m²), serviced portaloo toilet, bunded fuel storage and refuelling pad with hydrocarbon interceptor, weighbridge, wheelwash, water supply borehole, perimeter berms, vegetation planting and fencing; 4) Access to the site will be via the existing sand & gravel pit entrance; 5) Restoration of the site to agricultural lands; and 6)The proposed extraction operational period is for 10 years plus 1 year to complete restoration (total duration sought 11 years). An Environmental Impact Assessment Report (EIAR) and Natura Impact Assessment (NIS) have been submitted with this application
Construct a new dwelling house, septic tank & percolation area together with a new site entrance, ancillary site service and associated site works
Construct (1) a slatted cattle house, (2) the conversion of an existing hayshed to a slatted cattle house, (3) a cattle handling area and all ancillary works and services
Construct a dwelling house, septic tank and percolation area and new entrance and all associated ancillary site works.
Demolish an existing house extension and domestic shed, thereafter permission is sought to construct a new extension to the existing dwelling house. Permission is also sought to alter the existing boundaries, along with all ancillary site services and associated site works
Retain the existing storage shed (Shed No.1) and also permission to demolish an existing storage shed (Shed No.2) along with all ancillary site services and associated site works
The brief summarizes the pattern across all 89 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460545The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief