Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 724 decisions within 5 km, 2 exact-site or onsite candidate records, and 52 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
52 structured nearby appeal records.
52 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
Development will consist of the construction of a dwelling and ancillary storage shed, with connection to nearby public sewerage and water supply and all associated site works.
Construction of a dwelling and ancillary storage shed, with connection to nearby public sewerage and water supply and all associated site works
Planning Permission for alterations to existing Commercial unit and a change of use of lower ground floor commercial element to a studio apartment including all ancillary site works
CHANGE OF USE FROM COMMERCIAL TO A THREE BEDROOM RESIDENTIAL UNIT WHICH COMPRISES OF ALTERATIONS TO THE EXISTING LAYOUT INCLUDING ALL ANCILLARY SITE WORKS
CHANGE OF USE FROM CRECHE TO RESIDENTIAL USE
Demolish existing sunroom, construct new 2-storey rear extension, remove existing dormer windows at first floor level and replace with new velux rooflights and carry out minor elevational alterations to existing dormer dwelling. Works to include the creation of a new entrance driveway from the Knockranny village road.
The brief summarizes the pattern across all 724 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460759The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief