Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 496 decisions within 5 km, 1 exact-site or onsite candidate record, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for proposed development to consist of: (i) The construction of 5 no. wind turbines with the following parameters: a) Total tip height range of 179.5m – 180m, b) Rotor diameter range of 149m – 163m, c) Hub height range of 98m to 105m, (ii) Construction of turbine foundations, crane hardstand areas and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and meteorological mast to the proposed onsite electrical substation including cabling. in the public road corridor in the townlands of Gallstown and Kearneystown; (iv) Construction of 1 no. permanent 38kV electrical substation compound including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works in the townland of Piperstown. (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) All works associated with the connection of the proposed wind farm to the national electricity grid which includes 5 no. of water crossings (3 no. bridges and 2 no. culverts). The provision of joint bays and associated communication chambers along the underground electrical cabling route via underground 38kV electrical cabling predominantly within the public road corridor, from the onsite substation in the townland of Piperstown to the existing Drybridge 110 kV Substation located in the townland of Tullyallen; (vii) Reinstatement of all road and track surfaces above cabling trench along existing roads and tracks in public lands; (viii) Provision of new site access tracks and upgrade of existing site tracks/roads to facilitate access to all onsite infrastructure this includes 3 no. water crossings, passing bays and all associated drainage; (ix) The provision of 2 no. new permanent site entrances for construction and operational access from the local road L6274 in the townlands of Kearneystown and Gallstown; (x) The permanent realignment of 1 no. existing entrance for construction and operational access to the 38kV electrical substation compound from the local road L2275 in the townland of Piperstown; (xi) Use of 1 no. existing site entrance for construction, operational access to the permanent met mast on a private road off local road L2275 in the townland of Drumshallon. (xii) The construction of 1 no. new temporary track in the townland o
Permission for the demolition of part of existing two storey dwelling, proposed two storey extension to same and proposed construction of single storey independent living unit (50m2) to side of existing two storey dwelling, installation of proprietary waste water treatment system/percolation area, together with all associated site works **Significant further information received on 15.8.22 includes revised design and alteration to existing entrance**
Permission sought for dwellinghouse, wastewater treatment unit and percolation area, access lane to site and all associated site works.
Side/Front extension to existing dwelling, retention of existing waste water treatment system and proposed new percolation area to same and all associated site works
Retention permission for a single storey extension to the south west of the existing dwelling house, a porch extension to the north east of the dwelling house and a domestic store located to the north of the property inclusive of all associated site development works *Further information received on 1.9.23*
Permission for development to consist of the construction of a new part single storey part two storey dwelling house and new single storey detached garage / storage shed, new vehicular entrance to the site, new on site waste water treatment system, site works and landscaping.
The brief summarizes the pattern across all 496 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460766The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief