Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 212 decisions within 5 km, 9 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Removal of temporary modular classroom unit, construction of a single storey extension to the existing creche building, alteration of existing façades & roof areas, alteration of site boundaries, extension of childrens playground, erection of external fixed canopy areas, removal of existing car-parking area and provision of a new vehicle parking area for 23 no. car spaces including 4 no. disabled access vehicle spaces, new ancillary site structures to include a bicycle parking shelter, site landscaping, boundary treatments and ancillary site works
A portable cabin containing entrance lobby, toilets and classrooms as a temporary childcare facility and all associated site works
Installation of portable cabin containing entrance lobby, toilets and classrooms as temporary childcare facility and all associated site works
The construction of a single storey extension to the front of the existing school with connection to all existing utilities with all associated site works
The (i) erection of modular primary classroom unit, (ii) erection of modular SEN unit, (iii) erection of new covered walkway, (iv) provide soft play area (v) modification of existing sensory footpath (vi) connection to existing services and (vii) all ancillary site works
Demolition of an existing extension to dwelling house and permission to construct a new extension to the dwelling and all associated site works
The brief summarizes the pattern across all 212 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461015The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief