Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 553 decisions within 5 km, 5 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
2 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Planning permission for the following development: (1): construct a four bay workshop with canopy roof to side (phase 1), (2): construct a three bay workshop extension with canopy roof to side (phase 2), (3): construct single storey extension for use as offices, toilets, canteen, parts store and sales area (phase 3) (4): 5 year planning permission sought for portacabin office and toilets, (5): retain and upgrade existing entrance and construct new second entrance onto service road, (6): connect to public surface water, foul sewer and water mains, (7) provide onsite car and machinery parking areas, (8) all ancillary site development works on site
A plant & tool hire facility, with builders providers department, office, staff facilites and sales area, domestic fuel depot, new site entrances, removal of disused water tank, car parking and connection to all mains services and all associated site works. Significant further information/revised plans submitted on this application
The development consists of: 2 x portacabins multiplexed into a single structure for the purpose of conducting carpentry and other craftworks and to hold group social meetings. Retention Permission is required until Trim Men's Shed can raise funds to replace the structure, estimated to be a maximum of 2 to 3 years hence
Permission is being sought to construct a new workshop, social space and welfare facilities (114sq.m) in the form of Timber cladded steel containers to replace existing portacabin (83.3sq.m) previously granted retention permission planning ref: 221426 and all associated site works
Amendments to the development permitted under Ref: TA201886 (ABP-311002-21). The proposed amendments consist of an increase in height to a section of the single storey enclosed industrial unit from a height of 15.2m to 25.0m and all ancillary works. The area of floor to be increased in height is 513 sqm (30.7m x 16.7m)
Development will consist of a single storey enclosed industrial unit (floor area 2138 sqm and 15.2m high) with 6no. ancillary steel silos (98.7 sqm and 12.0 m in height) adjacent to the unit. The unit will contain 3no. separate industrial processes, production of dry mortar, bagging of bulk powders and manufacturing of steel girders. The unit will also include office space (231.8 sqm) and welfare facilities and comprises walls and railings to north and west boundaries, 3 metre high security fence along the east and south boundaries, 18 car parking spaces, bicycle rack, service yard, signage on the building, landscaped areas, attenuation tank, connections to all services and ancillary site development works. The HGV vehicular access to the site will be via an entrance to the west, with separate car and pedestrian access to the north east. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 553 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461066The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief