Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 423 decisions within 5 km, 1 exact-site or onsite candidate record, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a bungalow dwelling, effluent treatment system together with site access & all associated site works and demolition of existing barns
The construction of a single storey independent living unit attached to existing dwelling with associated site works
Construction of a ground floor single storey extension, first floor extension with dormer windows at the rear of the existing dwelling. Installation of a new sewage treatment system and all associated site works
A two storey dormer style dwelling, entrance, wastewater treatment system and associated site works
Construction of 1no. two storey dwelling house, a new site entrance which includes the boundary ditch to be set back to provide adequate site distance, new front entrance pillars, new fenced/hedged site boundaries, a new wastewater treatment system, and all associated site works
The demolition of an existing cottage, the construction of a new single storey dwelling, detached garage, recessed entrance with walls, piers and gates, waste water treatment system, and all ancillary site works
The brief summarizes the pattern across all 423 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461109The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief