Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 204 decisions within 5 km, 2 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a dwelling house, garage, wastewater treatment system & entrance along with all ancillary site works
As constructed entrance location and permission to complete same consisting of entrance walls and gates and retention for amendments to site boundaries as permitted under planning ref 17600483 together with all associated site and incidental works
Construction of detached split level dwelling, detached domestic garage, new entrance, onsite waste water treatment system, connection to necessary services together with all associated site and incidental works
The demolition of 2 no. existing prefabricated classrooms and the construction of 2 no. single storey stand-alone buildings with covered walkways to accommodate a classroom and an early intervention room as well as associated ancillary accommodation. External works to include retaining structures, ramps and steps to resolve existing site levels as well as new boundary treatments to the south and west of the site, a new wastewater treatment plant and percolation area and all other associated site works required to facilitate the development.
Amendments to previously granted planning permission for the construction of Multi Use Games Area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary & incidental works (Previous Planning Ref. 21/242), the amendments required are an increase in the size of the proposed MUGA to 55x40m together with additional floodlighting
Construction of Multi Use Games Area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works
The brief summarizes the pattern across all 204 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461143The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief