Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
26% of nearby decided applications were refused. The site check found 186 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
For a period of 10 years to construct and complete a solar PV Energy Development with a total site area of 173.3 hectares comprising of transformer stations and GRP enclosures, solar PV ground mounted on support structures, temporary construction compounds, access tracks (existing, new and upgraded), perimeter fencing, electrical cabling and ducting, CCTV and other ancillary grid infrastructure and associated works. The solar farm would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with the application. The export capacity to the grid is estimated be c. 118MEC AC. Revised by Significant Further Information which consists of: An amended haul route which incorporates 8 passing bays (7 on the L5006 and one on the unnamed road west of the Application Site)
The construction of a detached single storey dwelling, detached garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works
The construction of a detached single storey dwelling, detached garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works
For single storey dwelling, new site entrance, landscaping, effluent treatment plant and all associated site development works
The development will consist of the construction of a two storey dormer type dwelling, O'Reilly Oakstown BAF sewerage treatment system, well, recessed site entrance and all associated ancillary site works and to remove sterilization of land in respect of Planning File Ref. No. 91/990, Condition No. 10
Development will consist of the construction of a single storey type dwelling, O'Reilly Oakstown BAF sewerage treatment system, well, recessed site entrance and all associated ancillary site works and to remove sterilization of land in respect of Planning File Ref. No. 91/990, Condition No. 10
The brief summarizes the pattern across all 186 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461180The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.