Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 346 decisions within 5 km, 4 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The construction of a new vehicular entrance [in its original permitted location] & alteration to subdividing boundary with neighbouring property to decrease the size area to its original permitted size together with all associated site works. This is a concurrent application with neighbouring property
The as built extension to existing house. Planning permission is also being sought for the following, relocation of existing vehicular entrance, alteration to subdividing boundary with neighbouring property to increase the site area to its original size together with all associated site works. This is a concurrent application with neighbouring property
The construction of a single storey dwelling house, domestic garage, entrance, driveway, certified septic tank and percolation area and all associated site works
The construction of a new two storey dwelling house, a domestic garage, a waste-water treatment system, a new site entrance and all ancillary site works
A dwelling house, entrance, front boundary fence, wastewater treatment system and all associated site works as constructed from that previously granted under planning ref. 06/926
Two storey detached home, entrance, wastewater on site disposal, including all ancillary works
The brief summarizes the pattern across all 346 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461225The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief