Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 225 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 2 no. detached two storey dwellings served by 2 no. packaged wastewater treatment systems and soil polishing filters, the construction of 2 no. detached garages and all ancillary site works to include the boring of 2 no. private wells, new vehicular entrances and boundary treatments
The installation of a temporary standalone prefabricated building to be used for after-school childcare use including all associated site works and connections to existing services on site
A change of site boundaries as previously granted 06/3318, new site entrance, new wastewater treatment system, percolation area, new bored well and all associated site works
A new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works
A lean to extension for machinery storage to existing farm buildings
The construction of a single storey dwelling house, entrance, driveway, wastewater treatment unit, polishing filter and all ancillary site works
The brief summarizes the pattern across all 225 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461246The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief