Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 193 decisions within 5 km, 6 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For; 1) Demolition works to existing sheds (92 sq.m) and existing boundary walls; 2) The extension and reconfiguration of the existing car park with the addition of 14 extra car parking spaces bringing the total from 84 to 98 spaces including 20 EV charging spaces, 5 disabled spaces and 6 parent and child spaces. 3) Alterations to the existing entrance/exits onto Dominick Street to include the closure of one number exit and enlargement of second number exit from 6.0m to 8.0m wide, and the addition of an entrance only access 4.5m wide from the Clonfert Avenue with pedestrian crossing. 4) Site works to include the following, construction of a 2.0m high boundary wall, kerbing, footpaths, surfacing, associated drainage and installation of traffic management line marking. Gross floor space of any demolition: 92.00 sqm
The development will consist of placement of a pay-to-use portable waste compactor for the acceptance of residual and food waste and a pay-to-use portable compactor for mixed dry recyclables. Gross floor space of proposed works: 2x8sqm
For a development consisting of: 1. Partial demolition works to existing dwelling (50sqm); 2. Reconstruction works to existing dwelling to include construction of new gable wall; 3. Installation of signage on to the reconstructed gable wall of the dwelling; 4. Permission for site works to include the following, construction of a 2.1m high concrete post and timber panel fence enclosure to the unloading area, construction of a 2.0m high boundary wall to the reduced garden area, precast kerbing, footpaths, surfacing, associated drainage, installation of traffic management line marking and 1.5m high galvanised steel access gates to the entrance; 5. Permission for alterations to the existing exits onto Dominick Street to include the closure of one number exit to form a new compound area and enlargement of second number exit from 6.0m to 7.0m wide. Gross floor space of any demolition: 50 sqm
For an off licence use within an existing Supermarket unit at Super-Valu Supermarket. Gross floor space of proposed works: (off licence within Supermarket) - 76 sqm
For 1) change of use of commercial unit to dwelling 2) Minor alterations & refurbishment to existing dwelling & all associated site works
For constructing a rear two-storey extension and some internal changes to a protected building (RPS. No. 3771). Gross floor space of proposed works: 154.6 sqm
The brief summarizes the pattern across all 193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461297The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief