Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
25% of nearby decided applications were refused. The site check found 60 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
To extend the existing goat dairy to include a farm food tour observation/education area & ancillary storage room
For the installation of an 18-metre high lattice structure supporting 4no. radio-link dishes; a ground-level equipment cabinet; proposed palisade fence and 3-metre wide gate; fibre chamber; concrete drainpipe; concrete plinth and white stone compound ground finish, and all associated development. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed.
Le stór feirme a thógáil. Gross floor space of proposed works 177.38 sqm.
Chun (1) Síneadh 18.17sqm ar an urlár talún, (2) Athrú ar an Grianán atá ann faoi láthair, (3) Coinnéala do Teach atá ann cheana ar suíomh le teorainn athbreithnithe agus don obair agus seirbhíshí eile atá bainteach leis an suíomh.
To erect dwelling house, wastewater tertiary treatment system, polishing filter and all associated services. Gross floor space of proposed works: 109.60 sqm
Cead le haghaidh insealbhú 34 painéal fótavoltach mar aon leis na hoibreacha a bhanineann leo seo ar an bhfoirgneamh ag Naíonra Inis Mór, Mainistir, Inis Mór. Spás urláir comhlán na n-oibreacha beartaithe i; 56.5sqm (solar panels area). Spás urláir comhlán na hoibre atá le coinneáil i; 320sqm
The brief summarizes the pattern across all 60 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 25204The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief