Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 141 decisions within 5 km, 5 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a dwelling, site entrance, domestic storage shed, service connections and all associated site development works
A dwelling, entrance treatment, services connections and all associated works
Construction of a dwelling, garage, entrance treatment, services connections and all associated works
51 no. dwellings consisting of 20 no. detached, 28 no. semi detached and 3 no. duplex apartments, a creche development with separate site entrance, main service road, main site entrance to include all associated site development works under clause B 42 (1A)(a)(V)
51 no. dwellings consisting of 20 no. detached, 28 no. semi detached and 3 no. duplex apartments, a creche development with separate site entrance, main service road, main site entrance to include all associated site development works
51 no. dwellings consisting of 20 no. detached, 28 no. semi detached and 3 no. duplex apartments, a creche development with separate site entrance, main service road, main site entrance to include all associated site development works under clause B 42 (1A)(a)(V)
The brief summarizes the pattern across all 141 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief