Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 307 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) the construction of a domestic extension to the side of the dwelling, 2) to raise roof level of the dwelling and extend the floor area of the dwelling on first floor level, and include all necessary alterations, 3) to construct a detached domestic garage. And for RETENTION PERMISSION to retain 4) extensions and alterations to the dwelling, 5) existing domestic storage sheds and including all associated development works
Construction of a single-storey extension to our dwelling and all associated works
A) single-storey extensions to the front, rear and side of existing dwelling house including refurbishment and alterations to the existing dwelling, b) the change of use of the existing domestic shed to habitable accommodation and integration into the dwelling, c) upgrade and alteration of existing garage/shed, d) replace existing secondary site entrance gate with timber cladded wall, e) install new septic tank and percolation area and all associated site works
(i) milking parlour building incorporating holding yard with crush/drafting yard, meal bin, office, flow channel, storage rooms and plant rooms, (ii) cubicle shed with under effluent tanks and all associated site works
The construction of a dwelling, a detached storage shed, an effluent treatment system, an entrance and all associated site works
Dwelling, garage, effluent treatment system, entrance and all associated site works
The brief summarizes the pattern across all 307 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25258The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief