Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
31% of nearby decided applications were refused. The site check found 29 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
Of extension to south west of existing house and permission for new extension to north of existing house including internal layout changes and associated site works and services
Of 2 storage units. Gross floor space of works to be retained 287 sqm.
To (A) demolish existing conservatory (B) form archway in existing building (C) Construct new two storey extension (D) Construct new bedroom block (E) construct 6 no. detached sleeping pods (F) upgrade existing wastewater treatment system (G) associated site works at The Connemara Hostel, Tullyconor Leenane. (Gross floor space 616.56sqm)
For the construction of a two storey dwelling house with photovoltaic solar panels and septic tank connected to existing sewage treatment system pl. ref. 11/218 together with all associated site development works and services. Gross floor space of proposed works: 244 sqm
For the construction of a new single storey dwelling house with solar panels and a new wastewater treatment system and percolation unit together with all associated site development works and services. Gross floor space of proposed works 318 sqm.
For alterations and ancillary site works carried out on the existing boat shed (Previous Planning Reference No. 08/363). Gross floor space of works to be retained: 72 sqm
The brief summarizes the pattern across all 29 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 25351The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief