Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 174 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For (a) to demolish an existing porch and conservatory, (b) to construct a single front storey side extension and two storey front extension and (c) elevation changes with all associated site works
To a) RETAIN private detached garage to side of dwelling, b) RETAIN sun room extension to side of dwelling, c) RETAIN modifications to exiting dwelling and d) construct new extension to side of dwelling house along with all associated site works and services
To construct an extension to the rear and modify existing dwelling and associated works
(a) Demolish existing dwelling (b) construct a replacement dwelling house and garage (c) relocate existing vehicular entrance (d) replace existing septic tank with new effluent treatment system, all associated site works.
For the construction of a single storey dwellinghouse, garage & proprietary waste treatment plant, bored well, vehicular entrance and driveway and new agricultural entrance including all ancillary site works
Of a) private garage / store to rear of dwellinghouse, b) site boundaries/ site layout as constructed and c) modifications to windows and doors including additional Velux roof windows to rear of dwellinghouse along with all associated site works and services. Original planning reference Nos. P04-1519 and P05-145
The brief summarizes the pattern across all 174 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 25365The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief