Construction of a new residential house coupled with a domestic garage and the installation of a new wastewater treatment system including all other ancillary site development works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Sraheens , Achill , Co. Mayo
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 102 nearby planning records within 5 km where a location match is available.
- Matched source
- 25381
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Retention permission of extensions to front, side and rear of the existing dwelling house along with alterations and modifications to elevations
Planning application for alterations and extension to an existing detached dwelling including: two-storey extension; alterations to the roof; alterations to the elevations; internal reconfigurations; new on-site wastewater system; together with all ancillary site development works
Retention of Extensions to side and rear of Existing house
Retention permission of existing domestic garage along with alterations to site layout and all necessary works and ancillaries
RETENTION PERMISSION FOR 1) CHANGE OF HOUSE TYPE PREVIOUSLY APPROVED UNDER P06/1620. 2) CHANGE OF HOUSE POSITION TO THAT PREVIOUSLY APPROVED UNDER P06/1620. 3) ALL OTHER ANCILLARY SITE DEVELOPMENT WORKS ASSOCIATED WITH THIS DEVELOPMENT
The brief summarizes the pattern across all 102 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 25381The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief