Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 58 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Installation of a water pipe between Shrawee and Furmoyle
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICES
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO A PROPRIETARY EFFLUENT TREATMENT UNIT AS WELL AS A DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS
CHANGE OF USE OF OLD PRIMARY SCHOOL TO DWELLING HOUSE, EXTENSION AND ALTERATIONS TO EXISTING BUILDING TO FACILITATE A DWELLING HOUSE, NEW PROPRIETARY EFFLUENT TREATMENT SYSTEM TO REPLACE EXISTING SEWERAGE SYSTEM AND ALL ANCILLARY SITEWORKS AND SERVICES
ALTERATIONS TO A PREVIOUSLY GRANTED PERMISSION (P19/151) i.e. TO CHANGE THE DESIGN OF THE EXTENSION AND REDUCE ITS SIZE. ALSO TO KEEP THE FRONT BOUNDARY WALL AT ITS EXISTING LOCATION
The development will consist of the renovation and extension of existing dwelling house together with all ancillary site works.
The brief summarizes the pattern across all 58 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 255The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief