Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 267 decisions within 5 km, 1 exact-site or onsite candidate record, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
To construct a link corridor between house and out-building at "The Old School House", Corbally, Kilkee, Co Clare. This corridor will also act as a wind break
To construct a standalone building to the rear of the existing dwelling house incorporating a storage shed, home office and gym area ancillary to the dwelling house along with all associated site works
To construct a new single storey dwelling house, private garage, site entrance and wastewater treatment system along with all associated site works
To extend & refurbish existing single storey dwelling and to revise elevations
For development consisting of: a) Refurbishment and remodelling of existing single storey dwelling house, including changes to elevational treatment and fenestration, b) Construction of new bay window and dining area extension to northern elevation ( front ), c) Construction of new entrance canopy to rear, d) Remodelling of vehicular entrance to northern boundary and all associated works
The brief summarizes the pattern across all 267 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560156The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief