Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 563 decisions within 5 km, 6 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Ref 23/60083 for the construction of a new dwelling house, new entrance, effluent treatment system, percolation area and all associated site works
CONSTRUCTION OF A NEW BUNGALOW, INSTALLATION OF A PROPRIETARY TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED WORKS
The construction of a dwelling house, new entrance, effluent treatment system, percolation area and all associated site works
SINGLE STOREY DWELLING, ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH RAISED POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
SINGLE STOREY DWELLING, GARAGE, ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH RAISED POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
CHANGE OF SITE BOUNDARIES AND REDESIGNED GARAGE AS GRANTED UNDER PLANNING FILE REF 19206
The brief summarizes the pattern across all 563 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560213The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief