Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 212 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a new residential development of 20 new dwellings consisting of 2 No. Type A – Four bedroom semi detached two storey dwellings, 4 No. Type B/B1 – Three bedroom semi detached two storey dwellings, 4 No. Type C – two bedroom semi detached two storey dwellings, 4 No. Type D – two bedroom two storey townhouses, 6 No. Type E – one bedroom single storey townhouses, provision of public open space; landscaping and boundary treatments and new planting; water and utility services and connections; lighting; plus all enabling and ancillary development and works above and below ground level, plus a new site entrance. The proposed development falls within the curtilage of Donaguile House, a protected structure RPS reference C507,
A housing development to include the following; 1) Demolition of existing dwelling and kiosk 2) Construction of 13 no residential dwellings consisting of (a) 8 no terraced three bed two storey houses in 2 blocks, (b) 2 no semi-detached two bed two storey houses (c) 3 no terraced two bed two storey houses. 3) New vehicular access and internal streets including alterations to existing footpath 4) Mains water provided by an on-site bored well and associated plant room with provisions for future connection to public mains water supply 5) All associated site & development works including drainage infrastructure, boundary treatments and landscaping.
The construction of hurling ball walls, all weather surfacing, associated fencing and ball nets, associated drainage, site lighting and site works adjacent to existing sports playing areas,
For development at this site. The development consists of a new two storey standalone school accommodation extension. The additional student and teacher accommodation as follows: 3no. General Classrooms, 1no. Home Economics Room, 2no. Design & Communication Graphics Room, 1no. Art Room, 1no. Textiles Room, 1no. Science Laboratory and Prep room, 2no. Staff Offices, WC facilities, Locker Area, associated storage, service rooms and ancillary support accommodation. Associated Works: The works will include reconfiguration of the existing car park. New front gates (2no.vehicle and 2no. pedestrian) and front wall including re-positioning of same forward towards roadway. Reconfigurered set down layout, and diversion to the emergency vehicle circulation route to facilitate the development. New site lighting, landscaping, paving and road layouts to facilitate the development, relocated water storage tank. Development of new car park area and all associated roadworks, drainage, lighting, landscaping works. New boundary fencing to school site area located to eastern side of school site. New LPG tank and new electrical sub-station. The project will include for new ground positioned heat pumps, roof mounted PV panels (west facing roof), EV charging car spaces and a 20 space bike shelter. All other related road, drainage, service supply and waste removal work as required. Comprehensive site landscaping to newly development areas, including a row of screening trees to western boundary in vicinity of the new extension. All associated site works
For a special education classroom extension to the existing school to include the construction of a new roof and glazed structure over existing external yard area, associated adjustments to existing building and all associated siteworks
For a classroom extension to the existing school to include the construction of a new roof and glazed structure over existing external yard area, associated adjustments to existing building and all associated siteworks
The brief summarizes the pattern across all 212 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560447The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief