Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 282 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a new dwelling house, new site entrance, wastewater treatment plant, and all associated site works
Permission to retain & complete dwelling house as constructed foundations and pad footprint, constructed on foot by previously granted permission on PI. Ref. No. 09/596 permission to relocate site entrance, new wastewater treatment system, new gates & piers together with all ancillary & associated site works
Permission for a new dwelling house, new site entrance, wastewater treatment plant, and all associated site works
Permission to construct a slatted shed with underground storage tanks and attaching onto existing slatted shed and all associated site development works
Permission for development consisting of a single storey extension to the front of existing dwelling along with all associated site works
Permission to erect a storage shed for machinery and cattle feed and exit on to public road by existing entrance and all associated works
The brief summarizes the pattern across all 282 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560513The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief